Resources
/
Modules
/
Inventory
Modules
Inventory
Track parts and supplies, keep stock levels current, and see what’s on hand.
Still stuck?
Our support team can walk you through it
Inventory
What Chekhub Inventory does, the core terms it uses, how to add materials and suppliers, how stock moves as work is scheduled and closed, and practical tips for setup.
On this page
What Inventory Is
Inventory tracks the materials you stock, how much of each sits at every site, and who supplies it. Materials come in three kinds: consumables, spare parts, and tools. Attach them to tickets and PMs, and quantities drop automatically when the work closes. Inventory also flags stock that has dropped below its minimum or climbed above its maximum, so your team can reorder or rebalance before work is blocked.
Open Inventory from the main left-hand navigation. It sits below Sites, or right below Assets in organizations without the Site Manager license, where Sites is hidden. It has three tabs: Overview, Stock Levels, and Suppliers. The Suppliers tab appears only if your role can view suppliers.
Overview Tab
A big-picture snapshot of your entire inventory. It shows stock health at a glance: counts of stock that is below minimum, over maximum, or has no band set, plus charts for stock health by site, top materials by demand, and weekly consumption versus replenishment. The full materials catalog sits below the charts. This is where most inventory reporting lives. Filter it by Sites and Range (for example, Next 90 days), and export what you need.

Overview tab: status cards, charts, and the materials catalog
Stock Levels Tab
An in-depth, row-by-row look at your stock. Where Overview summarizes, Stock Levels is the working view: every material at every location, with its status, on-hand and reserved quantities, and, further right (scroll horizontally), its Available, Min, Max, and To order values. A dash means that limit isn't set. The site tree on the left maps down to floors and rooms. Filter by site, set a Range to limit which upcoming work counts as Reserved, click a status tile to filter the table, and use Set min/max to set bands for one or many stock levels at once. The pencil icon at the end of each row sets the minimum and maximum for that one stock level. Both require permission to edit materials.

Stock Levels tab: status tiles, Range, and every stock level by site
Suppliers Tab
A directory of the companies that provide your materials, shown as cards or a table. Search by name, sort by name in either direction, and switch views with the toggle in the top right.

Depending on your permissions, the Inventory header shows Create Material and Create Supplier. Both are covered step by step below.
Key Concepts about Inventory
Everything in Inventory builds on two ideas. First, a material is defined once for your whole organization, and it only gets a quantity once it's stocked somewhere. Second, a stock level is one material at one location, and each stock level has its own quantity and its own min/max band. The table below defines the key Inventory terms in Chekhub, listed alphabetically.
Term | What it means | Where you see it |
Available | On hand minus Reserved, calculated by the backend. Status and To order use On hand, not Available, so a row can show In band even when Available is under the minimum. | Stock Levels table |
Band (min/max) | The acceptable range for a stock level. Each location can set its own minimum and maximum, and each limit is handled separately: a location's own min wins, otherwise it uses the material's, and the same goes for max. Borrowed values show in italics with an asterisk, and hovering one explains that it's inherited from the material and can be overridden for that location. | Set min/max, Add locations |
Deficit | Demand minus supply for a material. | Material page |
Demand | The full list of material requests that tickets and PMs have made against a location, including work that's already finished. When you pick a Range, only requests inside those dates count. | Demand panel, Top materials by demand |
Location | Where stock actually sits: a site, or a spot within one, mapped as deep as you need (building, floor, room, or equipment space). Stock and min/max bands can only live on locations, not on assets. | Stock Locations on the material page |
Material | A stockable item, defined once for your whole organization: a consumable, spare part, or tool. It has a type, a unit of measure, an item number, and optional part numbers, SKU, barcode, cost, default min/max, custom properties, and attachments. | Overview catalog, material page, Create Material |
On hand / supply | The quantity physically in stock. | Stock Levels table, Total supply |
Part status | Active, Obsolete, Discontinued, Superseded, or Archived. Only Active parts (or parts with no status) can be added to new tickets and PMs. Work that already has the part keeps reserving and consuming it. Use Substitute Part to record what replaces a part that's no longer active. | Create Material, Planning section |
Planned / actual quantity | On a ticket or PM's Materials tab, planned is what the work expects to use, and actual is what was used. Closing deducts the actual quantity. | Materials tab on tickets and PMs |
Reserved | The total requested by open work only, meaning the stock that's actually spoken for right now. When you pick a Range, only requests inside those dates count. | Stock Levels table |
Site | A facility where stock is held. Sites can be nested inside other sites. | Stock Levels site tree, Sites filter |
Status | Below minimum, Over maximum, In band, or No band set (neither a min nor a max), based on on-hand quantity against the band. The table's status pills shorten these to Below min, Over max, In band, and No band. | Status cards, Status column |
Stock level | One material at one location, with its own quantity and its own min/max band. | Stock Levels table |
Supplier | A company that provides materials, with account and shipping details, commercial terms, addresses, and contacts. One supplier can be linked to many materials, each with its own price, lead time, part number, and ordering URL. | Suppliers tab, Create Supplier |
To order | The suggested reorder quantity, based on On hand (not Available). When a stock level is below its minimum, To order refills it to the Max, or to the Min if no max is set: Max (or Min) minus On hand. Otherwise it's 0. It's the last column on Stock Levels. | Stock Levels table (scroll right) |
Transaction | A logged stock movement: a Consumption (closed work used stock), an Adjustment (stock added, deducted, or corrected by hand), or a Transfer (stock moved between locations). | Transactions tab on the material page |
How to Create a Material
Materials are the stockable items you track in Inventory. Each one is created from a single form with two tabs: Material holds the item's identity, planning, and cost details, and Suppliers links it to the companies that provide it.
Open Create Material
From any Inventory tab, click Create Material in the header. The form opens on the Material tab.

Create Material button in the Inventory header
Fill in the material details
Give the material a Name and choose a Type, such as Consumable. Under Details, set the Unit of Measure and enter an Item Number. In most organizations, these four fields are required.

Create Material: Material tab, filled in for Duct Tape (Roll) Everything else is optional: a photo, Tax Code, Description, Manufacturer Part Number, SKU, Unit Cost, Unit Price, and Taxable. Under Planning, you can also set Criticality, Part Status, Lead Time, and Minimum and Maximum Quantity. The lead time unit unlocks only after you enter a lead time. The minimum can't be higher than the maximum. Setting Part Status to anything other than Active stops the part from being added to new work; see Part status in Key Concepts about Inventory.
Change the Unit of Measure from Each for anything measured differently, such as cabling. Further down the form are Substitute Part (under Planning), Manufacturer, Alt Part #, Alt Manufacturer, Alt SKU, and Barcode. Below those, click + Property to add custom properties, such as a shelf or bin location, and use + Attachment or Library to attach files. (Library appears if your organization has the Documents license.)

Create Material: alternate part fields, Barcode, Properties, and Attachments
Link suppliers
Open the Suppliers tab and click + Supplier. Choose a supplier from the Supplier dropdown. If it isn't listed, create it first with Create Supplier.
Add that supplier's terms for this material: Cost, Currency, Unit Price, Min Order Qty, Lead Time, Part #, SKU, Notes, and URL. Click Save on the card, and repeat for each additional supplier. Saved suppliers collapse into a list, and the number on the Suppliers tab shows how many are linked.

Save the material
Click the checkmark in the top right to save, or the X to discard. The new material then appears in the Overview catalog.
Stock it at a site
A new material has no quantity anywhere yet. Open it from the Overview catalog to see its material page: Total supply, Total demand, and Deficit across the top, then Stock Locations, Demand, and Details. The Transactions, Add locations, and Set min/max buttons sit above the Stock Locations list.

Material page: supply and demand, Stock Locations, Demand, and Details Under Stock Locations, click Add locations, choose one or more locations, and optionally set a Minimum and Maximum. The same band applies to every location you pick, and a field left empty uses the material's own value. Adding a location doesn't add stock; it starts at 0 on hand.
To change one location's band later, select it and click Set min/max.
Click Transactions to add or move stock. Set Type to Adjustment, choose the stock location, and enter the item and quantity under Materials. Set Type to Transfer to move stock, choosing a Source and Target Stock Location. Both have optional Reason and Notes fields, and + Material lets one transaction cover several items.




How to Create a Supplier
Suppliers are created once and reused across any number of materials. Only the name is required. Terms set here apply to the supplier as a whole, while per-item pricing, lead time, and part numbers are set on each material's Suppliers tab.
Open Create Supplier
From any Inventory tab, click Create Supplier in the header.

Create Supplier button in the Inventory header
Fill in the supplier details
Give the supplier a Name and a short Description, and add a photo or logo if you like. Then add your Account # with the supplier, the Shipping Methods they offer (for example, Ground, Air, Freight, or Pickup), their Website, and their Industry.

Create Supplier: name, description, and supplier details
Set commercial terms, addresses, and extras
Under Commercial Terms, set the Tax ID, Currency, Payment Terms, Qualifications, and Tags. Further down the form, use + Address to add one or more addresses, + Property to add custom properties, and + Attachment or Library to attach files. (Library appears with the Documents license.)

Create Supplier: Commercial Terms, Addresses, Properties, and Attachments
Add contacts
In the Contacts panel on the right, click + Contact for each person you work with at the supplier. Each contact card has a Title, First Name and Last Name (both required), Email, Phone, and Notes. Click Save on the card, or Cancel or Delete to discard it.

Create Supplier: adding a contact
Save the supplier
Click the checkmark in the top right to save, or the X to discard. The supplier then appears on the Suppliers tab and in the Supplier dropdown on Create Material.
How Stock Moves
Quantities change only through transactions. Here's the full lifecycle, from a new material to stock being used up.

Create the material
It's an organization-wide definition, such as "4x4 Plywood," and isn't tied to a site. Creating it adds no quantity.
Add stock locations
Stock it at a site, or at a floor, room, or equipment space within one. Each location can set its own min/max band; for example, one site's minimum could be 7 while another's is 2. See Add locations under How to Create a Material.
Put stock in or move it
On the material's profile, click Transactions and choose a Type. An Adjustment adds or corrects stock at a location. A Transfer moves stock from one location to another, and its quantity must be more than 0. See the Adjustment and Transfer screenshots under How to Create a Material.
Demand builds as work is scheduled
Every ticket or PM with materials on it adds a request against a location. All requests count toward Demand; while the work is still open, they also count as Reserved.
Work closes and stock is consumed
When a ticket or PM interval reaches Closed, its materials are deducted automatically and logged as a Consumption on the material's Transactions tab. The log shows the ticket as the Target, the stock location as the Source, the quantity, and a system note naming the closing ticket. The quantity is no longer reserved.

Transactions tab: a Consumption logged when a ticket closed
Anything used without a ticket is adjusted by hand
For example, if someone swaps a light bulb without a ticket, record an Adjustment that deducts what was used. Transactions can't be edited after they're saved. To fix a mistake, record a correcting Adjustment.
Materials on Tickets, PMs, and Procedures
Materials attach to work through a Materials tab, and each line has a planned quantity and an actual quantity. Closing the work deducts the actual quantity. Materials can come from four places.
PM series
On Schedule PM, open the Materials tab and click + Material. Each line has a Name (the material), a Source (the stock location to draw from), a Quantity, and a Per Asset toggle.
With Per Asset on, the quantity is multiplied by the number of assets on the PM, and Total Qty shows the result; for example, 5 per asset across 2 assets is 10. Per Asset only works once the PM has assets, and the Ticket tab shows its asset fields only after you enter a Title.

Schedule PM: Materials tab, with Per Asset on Pick the material first; the Source list stays disabled until you do. Source opens a searchable location tree of sites and the locations nested inside them; expand a site with its arrow to see what's inside. Locations that stock the material show how many are available, in green when there's stock and red at 0.
Each interval inherits these lines, and you adjust quantities on the interval.

Schedule PM: Source location tree
Tickets and work orders
On Create Ticket, open the Materials tab and click + Material. Each line has the same Name, Source, Quantity, Per Asset, and Total Qty fields as on a PM. Materials can also be added later on the ticket's Materials tab.

Create Ticket: Materials tab Once the ticket is saved, its Materials tab splits Quantity into Planned Qty and Actual Qty, with Total Qty between them. The grey number in Actual Qty is just a hint showing the planned total. Leave it blank if you used the same amount as planned, or click in and type the real amount used. Actual Qty can be edited whenever Planned Qty can, and it’s the amount deducted when the ticket closes.

Saved ticket: Planned Qty and Actual Qty Enter the actual quantity before you close. A blank Actual Qty means everything planned was used. If you planned 8 filters for 8 generators but only serviced 6, type 6 in Actual Qty, or all 8 filters will be deducted.
Ticket templates
In Admin > Tickets, edit a ticket template and use + Material in its Materials section. Template lines have a Name, Quantity, Per Asset, and Total Qty, but no Source; the location is picked on each ticket. Tickets created from the template start with those materials.

Admin > Tickets: ticket template Materials section
Procedures
In Admin > Procedures, edit a procedure template and open its Materials tab. Click + Material and pick a Name and Source. Those materials flow into the Materials tab of any ticket the procedure is applied to. A procedure run on 8 assets brings in 8 units.
Don't add the same material twice. If a procedure already brings in a material, adding it again on the ticket counts it twice.

Admin > Procedures: procedure template Materials tab
Checklists: materials can't be linked to a specific checklist step.
Tips and Workarounds
Shelf and bin locations
Instead of creating hundreds of tiny locations, add a custom property, such as "Shelf location: Demo Security Center, Row 2, Bin 4." Because materials are organization-wide, include the site in the value. To add one, open the material, click the pencil icon to edit it, scroll down to Properties, and click + Property.

Edit Material: a Shelf location custom property
Forecast one area
On the Overview, set Sites to a single location, such as a first-floor chiller plant, and set Range to see what that area will need.

Overview filtered to a single site
Know which number to plan with
Plan with Reserved, not Demand. Demand includes finished work. See Key Concepts about Inventory.
Run a monthly reorder check
At month's end, open Stock Levels, where Below min rows sort to the top, and scroll right to To order. It shows how many to buy to refill each one to its max.
Save ordering links on the supplier
For items without a part number, such as something bought from a small vendor, put the product link and price on that material's supplier card. Then ordering happens from Chekhub instead of from links passed around by email.
Make technicians check parts first
Add an early checklist or procedure step: "Check the Materials tab and verify all parts are on hand."
Note: Once a material exists, set its stock bands from Stock Levels with Set min/max, and add stock locations from the material's own page. Questions about a specific setup? Reach out to your Chekhub admin contact or support.


